The file below has been archived for historical reference purposes only. The content and links are no longer maintained and may be outdated. See the OER Public Archive Home Page for more details about archived files.

APPENDIX 3. CONSTRUCTION COST ESTIMATE
OUTLINE (PHS GPS 9505)


THIS IS A SUGGESTED FORMAT AND IS NOT TO BE CONSTRUED AS A REQUIRED FORM.

Estimate the costs in which the Federal Government is requested to participate.

1. Demolition $ _______________
2. General alteration and renovation (e.g., carpentry, masonry, painting)$ _______________
3. Plumbing $ _______________
4. Heating, ventilation, and air conditioning $ _______________
5. Electrical $ _______________
6. Architect's and engineer's fees $ _______________
7. Other costs (specify) $ _______________
8. TOTAL ALTERATION AND RENOVATION COSTS
(to Federal Government)
$ _______________
9. Fixed equipment $ _______________


LIST SOURCE AND AMOUNT OF FUNDS FOR TOTAL ALTERATION AND RENOVATION PROJECT:

PHS SOURCES AND AMOUNTS: ALL SOURCES AND AMOUNTS OTHER THAN PHS:
__________________________________ ___________________________________________________
__________________________________ ___________________________________________________
__________________________________ ___________________________________________________
__________________________________ ___________________________________________________
__________________________________ ___________________________________________________


Total net square feet of floor area in alteration
and renovation proposal
_________________
Estimated cost per net square foot, excluding
fixed equipment
$ _______________



prev prev